Count the working days between two dates, or work out the date a given number of working days away, with your own weekend and holiday list.

Use the form 2026-01-26. Anything after the date is treated as the holiday name and ignored.

Working days

Two questions, one calculator

Almost every business-day question is one of two shapes. Either you have two dates and need to know how many working days sit between them, which is what invoice terms, notice periods and service levels are counted in, or you have one date and a number of working days and need the date you land on. Both are here, on the two tabs above, sharing the same weekend and holiday settings so you never have to enter them twice.

The weekend is not the same everywhere

Saturday and Sunday is the common case, but it is far from universal. Much of the Gulf works a Friday and Saturday weekend or, since 2022 in the UAE, a Friday afternoon and full Saturday. Nepal has a one-day weekend on Saturday. Many Indian offices and most banks run a six-day week with only Sunday off, and plenty of factories run every day. Picking the wrong weekend silently changes the answer by twenty percent or more over a month, so it is a setting rather than an assumption.

Holidays are yours to list

There is no built-in holiday calendar here, and that is deliberate. A national list is wrong for anyone whose state adds its own days, wrong for a company with a shutdown week, and out of date the moment a government moves a date, which happens every year. A stale list that looks authoritative is worse than no list, because you would not think to check it. Paste your own dates instead, one per line, and add the name after the date if it helps you read them back. A date the calculator cannot read is reported rather than quietly ignored, since a typo that drops a holiday from the count leaves no trace in the answer.

Counting the end date, or not

This is the detail that makes two calculators disagree. "Five working days from Monday" usually means you finish on the following Monday, counting forward five days and not counting the start. "How many working days between the 1st and the 30th" usually means the days you will actually work, which includes both ends. The checkbox lets you say which you mean, and the summary line always spells out the choice that produced the number, so you can check it against whatever contract or policy you are working from.

Why the dates never drift

Dates here are handled as plain calendar dates rather than as moments in time. It is a small thing that matters: a naive loop that adds twenty-four hours at a time skips or repeats a day in every country that changes its clocks, because a day is 23 or 25 hours long twice a year. Nothing on this page has a clock time attached, so nothing can drift.

Alorah Foundation logoAlorah Foundation80G tax benefitYour gift becomes someone's lightA registered charitable trust in Coimbatore serving the poor and the sick. Give by UPI or bank transfer.Donate now

Frequently asked questions

Does it count the start and end dates?

The start date is always counted if it is a working day. The end date is counted only if you tick the box, because both conventions are in common use and contracts differ. The line under the answer always states which one produced the number.

How do I enter holidays?

One per line, in the form 2026-01-26. You can write the name after the date, like "2026-01-26 Republic Day", and everything after the date is ignored. Any line that cannot be read as a date is listed back to you rather than silently skipped.

Why is there no built-in holiday list?

Because a built-in list would be wrong for most people and would go stale. Holidays vary by country, by state, by industry and by company, and governments move dates every year. Your own list is short to paste and always correct.

Can I count a six-day working week?

Yes. Set the weekend to Sunday only for the common six-day week, or to no weekend at all for an operation that runs every day.

Does it handle daylight saving?

It never has to. Dates are treated as calendar dates with no time attached, so the count cannot be thrown off by a clock change.